| Press capacity | Rated force, working pressure, and the force available throughout the required stroke. | Capacity chart showing force versus stroke or operating conditions; confirm the rating matches the intended forging process. | Choose a press with adequate capacity for the actual workpiece and process, without relying on peak force alone. |
| Die space and stroke | Daylight, stroke length, bed dimensions, and space for dies, tooling, and workpiece handling. | General arrangement drawing with the working envelope, bed size, daylight, stroke, and any relevant openings. | Check the largest planned die and workpiece, plus the clearance needed for loading and maintenance. |
| Operating speed and control | Approach, working, and return speeds; cycle control; and the ability to adjust the process where required. | Cycle description and speed data for the intended operating mode; confirm control functions and operator interfaces. | Match the speed profile to the forging process and required production rate, not just the fastest stated cycle. |
| Point-of-operation safety | Protection against access to the die area during hazardous motion, including guarding and interlocked access where appropriate. | Risk assessment, safeguarding layout, safety-control documentation, and a demonstration of protective functions. | Assess the complete installation and operating method against applicable local safety requirements. |
| Emergency and safety controls | Emergency-stop access, safe stopping behavior, control reliability, and protection against unexpected restart. | Safety circuit information, stop-function test procedure, restart procedure, and instructions for lockout and isolation. | Confirm operators can reach controls safely and that maintenance isolation procedures are clearly documented. |
| Hydraulic system | Pump and motor arrangement, filtration, fluid cooling, leak control, and monitoring of pressure and temperature. | Hydraulic schematic, recommended fluid and filtration requirements, inspection points, and alarm or monitoring details. | Prefer an accessible layout with clearly identified service points and suitable provisions for the operating environment. |
| Routine maintenance | Inspection intervals and service tasks for hydraulic fluid, filters, hoses, seals, guides, and electrical components. | Maintenance schedule, parts list, lubrication instructions, and estimated routine service requirements. | Compare the workload and service access with the skills and maintenance resources available at your facility. |
| Wear parts and spares | Availability of filters, seals, hoses, sensors, and other parts that may need replacement during service life. | Recommended spare-parts list, part identification information, typical availability, and ordering process. | Check lead times for critical items and identify suitable spares before commissioning. |
| Installation and utilities | Foundation loads, floor requirements, electrical supply, hydraulic cooling needs, and space for installation and service. | Installation drawings, utility requirements, shipping and handling details, and commissioning checklist. | Confirm site readiness, access routes, and utility capacity before finalizing the equipment configuration. |
| Supplier support | Installation assistance, operator and maintenance training, technical response, and service coverage. | Written scope of supply, training plan, warranty terms, service contact process, and support response commitments. | Compare support commitments in writing and confirm they cover the intended location and operating schedule. |
| Acceptance and documentation | Factory and site acceptance checks, operating instructions, safety information, drawings, and maintenance records. | Proposed acceptance-test checklist and complete documentation package in a language the operating team can use. | Agree on measurable acceptance criteria before purchase and retain records for training and future servicing. |